Book, Tulsa, Oklahoma, PennWells Books, 1977, 500 p. In October, 1859, Colonel Edwin Drake rigged up a pump to produce an oil and water mixture a distance of ten feet to the surface. It was the world’s first commercial oil well and the first use of artificial lift to commercially produce oil. Today, 140 years later, pumps are employed in more than 80% of all artificial-lift wells. When oil or gas is being produced the reservoir pressure reduces. At a certain point in time it can happen that the pressure in the reservoir becomes too low for production and artificial lift can be required. Artificial-lift methods fall into two groups, those that use pumps and those that use gas. Features and add-on options By choosing from various add-on options, such as coalbed methane, gas field operations, reservoir coupling, EOR, multisegmented wells, and surface networks, ECLIPSE simulators can be tailored to your needs and greatly enhance the scope of your simulation studies.
Чтобы скачать этот файл зарегистрируйтесь и/или войдите на сайт используя форму сверху.
Author: n/a. Report, Hague, Netherlands, Shell Internationale Petroleum Maatschappij B.V., 1973, 155 p.
Gas lifting can be used throughout the whole lifespan of an oil well: from the time it dies until its abandonment. The Gas Lift Manual is a thorough, handy reference that is essential to the practicing engineer needing to successfully perform this type of artificial lift...
2nd edition. Tulsa, OK: George E. King, 1998. - 663 pages. Introduction: Basic Well Completion Concepts Introduction: Geology Well Planning Drilling the Pay, Selecting the Interval and the Initial Design Casing Design Cementing Packer Selection and Tubing Forces Well Heads, Chokes and SSSVs Corrosion and Erosion Inflow Performance, Tubing Selection, and Artificial Lift Special...
3rd edition. — Elsevier Inc., 2011. — 736 p. Once a natural gas or oil well is drilled, and it has been verified that commercially viable, it must be "completed" to allow for the flow of petroleum or natural gas out of the formation and up to the surface. This process includes: casing, pressure and temperature evaluation, and the proper instillation of equipment to ensure an...
Penn Well Corporation, 2011. 1545 p. — ISBN: 978-1-59370-231-1. Part 2 Petroleum engineers face the daily challenges of designing and testing wells. Finding the right technical data guide for conducting these tasks can be daunting, and so renowned petroleum engineer George Stewart has written the comprehensive volume Well Test Design & Analysis, filled with advanced information...
Penn Well Corporation, 2011. 1545 p. — ISBN: 978-1-59370-231-1. Part 1 Petroleum engineers face the daily challenges of designing and testing wells. Finding the right technical data guide for conducting these tasks can be daunting, and so renowned petroleum engineer George Stewart has written the comprehensive volume Well Test Design & Analysis, filled with advanced information...
Москва: изд-во «НЕФТЬ и ГАЗ» РГУ нефти и газа им. И.М. Губкина, 2008. — 296 с. Приведены методики, даны примеры расчета параметров технологических процессов добычи нефти фонтанным, газлифтным и механизированным способами, увеличения производительности скважин, поддержания пластового давления, сбора и подготовки нефти, газа и воды на промыслах. Рассмотрены физические основы...